Choosing Finishes on a Central Austin New Build: What You Can Still Change, and When
How much you can choose on a new central Austin home depends on how far along it is when you buy. Here's what's usually open at each stage of construction and how to make the choices without slowing the build.

On a new central Austin home, what you can still choose depends mostly on one thing: how far along the house is when you sign. Buy before the foundation is poured and you may have a say in nearly every finish. Buy once the drywall is up and most choices are already made, though paint, light fixtures, and hardware may still be open.
Most infill homes here are built by small local builders, often on spec, so there's no design center with a catalog. The builder usually has a set of standard finishes and a few upgrade options, and how flexible they are varies from builder to builder.
What's usually open at each stage
Every build runs a little differently, but the decisions tend to come in this order:
- Before the foundation. Layout changes, if the builder allows any, plus things that go in the slab, like plumbing locations for a kitchen island or a floor outlet.
- Framing. Window and door choices, built-in niches, and the location of walls and openings. Electrical and plumbing rough-in come right after, so outlets, lighting locations, and low-voltage wiring are decided here.
- Before drywall. Last chance for anything inside the walls: extra blocking for shelves or TVs, speaker wiring, and insulation upgrades.
- After drywall. Cabinets, countertops, tile, and flooring are ordered and installed. Lead times on cabinets and stone mean these choices are often due well before installation.
- Near the end. Paint colors, light fixtures, plumbing fixtures, and hardware.
If you're buying partway through, ask the builder for the list of what's already been ordered. That tells you exactly what's still open.
How builders handle selections
Small builders usually work one of a few ways. Some give you a short menu of options at each level, standard and upgraded. Some give you an allowance, a set amount for a category like lighting or tile, and you pay the difference if you go over. Others will price any change you ask for as a change order.
Get the terms in writing before you start choosing. The details that matter most:
- The deadline for each decision
- How upgrades and change orders are priced
- Whether upgrade costs are paid up front, and whether that money is refundable if the sale falls through
- Whether changes can push back the completion date
Making the choices without slowing the build
Builders set selection deadlines because a late decision can hold up the trades scheduled behind it. A few habits help keep things moving:
- Decide in order. Start with the choices that are hardest to change later, like layout, windows, and electrical, then move to surfaces and fixtures.
- Visit the house. Choices look different in the actual rooms. Seeing the light and the scale before you pick tile or paint helps.
- Know what's standard. Many builders' standard finishes are already a step above what you'd find in an older home. Our post on what comes standard in a new central Austin home explains the spec sheet.
Where it's worth spending, and where it can wait
A useful rule: spend on what's hard to change after you move in, and wait on what's easy. Things inside the walls, like wiring, blocking, and insulation, are hard to add later. So are flooring and tile, which are disruptive to replace. Paint, light fixtures, and hardware are easy to change down the road, so the builder's standard options are often fine to start.
If you're buying a finished home, the choices are made, but you can see exactly what you're getting. We weighed both paths in buying a finished home or buying before it's built.